0 15 50 70 95 The figures in detail: · 0 Serious Injury or Fatality (SIF) · 0 Lost Time Accidents (LTA) · 15% Of Operational Equipment Efficiency (OEE) · 15% reduction of Conversion Cash Cost (CCC) - how efficiently we’re running the plant. Lower conversion cash cost = better performance and more profit. · 50% Waste Reduction · 50% Internal Cost of Quality reduction · >70% of team multiskilled up to Gold level - (3 machines) · >70% score at yearly Engagement Survey · 95 % maintenance Uptime · 95% Manufactured on time in Full (MOTIF) IN A DARTBOARD SETTING THE DART BOARD NEEDS TO HAVE THE POINTS IN IT AND THE COLOUR OF BLUE ORANGE AND WHITE ASWEL AS THE NUMBERS NEED TO BE INCLUDED IN IT See more